Master Plan a 240 MW Data Center Campus

Culpeper DC needed a multi-building data center campus capable of delivering 240 MW of capacity, powered by an onsite substation and water source, while giving tenants a refined sense of arrival at every building entrance.

Master Planning Through Conceptual Design

We led master planning, data center building programming, and conceptual design and visioning for the Culpeper, VA campus in 2023, sizing two multi-story buildings for 96 MW of capacity each and a single-story building for 48 MW. Frameless curtain walls and large-format ACM panels create a refined, welcoming arrival for tenants at every building entrance.

A Vision for a 240 MW Campus

The result is a conceptual master plan for Culpeper DC, a 240 MW data center campus positioned to scale from onsite power and water infrastructure to a tenant arrival experience worthy of the mission-critical work happening inside.

Exterior of industrial building with navy and glass entrance and landscaped parking lot.

Delivering design without asterisk.

In a world where promises often come with exceptions, limitations, and fine print, we believe great design should not. We approach every challenge with a commitment to delivering the best possible outcome, not the easiest one. No shortcuts. No hidden surprises. No asterisk.