Project Ditto needed a campus that could launch at 56 MW while being engineered to expand to 168 MW using offsite power and water sources, all without compromising the tenant experience at the center of the design.
We led master planning, basis of design development, conceptual design, and full architectural services for the Corsicana, Texas campus, developing a multi-story "Tie-Fighter" design anchored by a centralized office hub with Class A finishes. A prominent social stair overlooks the entry courtyard through expansive curtain wall glazing, giving the campus a defining moment of arrival.
The result is Project Ditto, a 56 MW data center campus in Corsicana, Texas, engineered to expand to 168 MW while anchored by a centralized, Class A office hub and a social stair that gives the campus its own identity.
Culpeper DC Culpeper, VA
P1 Motor Club Port St. Lucie, FL
Pharmaceutical Project Research Triangle Park, NJ
The design-build process has fundamentally redefined the modern architectural practice. Historically, the architectural world operated on standard segregation: design first (Architect), bid second (Owner/Contractor), build third (General Contractor).
Over more than two decades of planning manufacturing, distribution, industrial, commercial, and other complex facilities, I’ve learned that successful projects are rarely defined by the building alone.
As we launch our new website, we have an opportunity to introduce more than just a new digital presence; we have an opportunity to share the philosophy that...
In a world where promises often come with exceptions, limitations, and fine print, we believe great design should not. We approach every challenge with a commitment to delivering the best possible outcome, not the easiest one. No shortcuts. No hidden surprises. No asterisk.